The following are charges relating to construction:
Temporary Service Connection Charge
A temporary meter will be installed for use during the course of construction. The cost of water used is $532.67 per acre foot plus applicable zone charges. A deposit will be required for each meter, in addition to a deposit for a backflow protection device.
| DEPOSIT | |
|---|---|
| Meter | $680.00 |
| Backflow Device | $350.00 |
Installation and Removal Charge
| AMOUNT | |
|---|---|
| Meter and Backflow Device | $120.00 |
Relocation Charge
| AMOUNT | |
|---|---|
| Meter and Backflow Device | $60.00 |
Monthly Service Charge
| AMOUNT | |
|---|---|
| Monthly Service Charge | $21.00 |
| Monthly Backflow Charge | $29.30 |
Rates are subject to change.